#1
|
|||
|
|||
Two scheduled backups back to back
How is it possible to have SuperDuper kicked off by a schedule and another backup that is also schedule to start after the other one finishes? Obviously I can space them apart timewise and hope its enough time, but I'm wondering if there is a better way to have two backup jobs linked to each other some how so that one follows the other always. Or that being said, is there any problem if two instances of SuperDuper fire off jobs overlapping each other?
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Scheduled SmartUpdate with Time Machine | arthurlewis | General | 5 | 04-10-2009 04:30 PM |
Saving backups? Necessary for scheduled backps? | gcoghill | General | 2 | 12-09-2007 11:43 PM |
Scheduled Backups Don't Run | Drdul | General | 3 | 08-07-2007 06:45 AM |
Scheduled backups failing using WD MyBook USB HD | timslim | General | 3 | 05-31-2007 08:22 AM |
Feature request: "Run scheduled backups NOW" option | ChicagoLarry | General | 1 | 09-11-2006 12:29 PM |